Dakota County Soil & Water Conservation District
4100 220th St. West, Suite 102 Farmington, MN 55024
Phone (651) 480-7777 FAX (651) 480-7775
Home

About Us

Have a Question

Board Information

Services & Programs

Tree & Shrub
Order Form


Publications

Visit Us

Staff

Links




BDWMO

CGWMO


Extension & Conservation Center
4100 220th St. W., Suite 102
Farmington, MN 55024

Phone: (651) 480-7777
fax: (651) 480-7775


Endres Streambank Stabilization Project

Streambank and Shoreline Stabilization and Naturalization Fact Sheet : Streambank and Shoreline Projects Photo-Log Index : Endres Streambank Stabilization Project

Leon and Joan Endres contacted the SWCD because their 150-foot streambank on the Vermillion River in Hastings was eroding at an increasing rate. Their property is part of the new development in the southwestern corner of Hastings and the timing of a fall streambank stabilization project fit well with the landscaping and house construction plans. The Endres’ received a 50% match Community Conservation Cost-Share grant to grade the bank to a gradual slope, install three boulder vanes (rock flow deflectors that extend into the river), place 350 dormant willow stakes, and construct 140 feet of fascine. Grading and boulder vane installation began on November 30, 1999 and was completed the next morning. All of the bioengineering was completed on December 1, 1999. Additional plantings will be added in the spring of 2000.

Project Location

The following individuals designed and/or installed the project: Joan and Leon Endres (the landowners), Jay Riggs (SWCD), David Holmen (SWCD), Darrin Kron (SWCD), Darrin Carlson (NRCS), and Laura Jester (SWCD). Grading and boulder vane construction was done by Tom Otto of Otto Excavating.

Photos (November 30 - December 1, 1999):
Eroded Bank Eroded Bank Eroded Bank Bank Shaping Bank Shaping Bank Shaping Boulder Vane Installation Boulder Vane Installation Boulder Vane Installation Boulder Vane Installation Fascine and Willow Stake Installation Fascine and Willow Stake Installation Fascine and Willow Stake Installation Fascine and Willow Stake Installation Fascine and Willow Stake Installation Fascine and Willow Stake Installation Fascine and Willow Stake Installation Completed Construction Completed Construction The Bioengineers

2000
February 29, 2000 - Upstream February 29, 2000 - Downstream May 9, 2000 - Upstream May 9, 2000 - Downstream July 11, 2000 - Upstream July 11, 2000 - Downstream August 4, 2000 - Upstream August 4, 2000 - Downstream

July 15, 2004
July 2004 July 2004 July 2004


Home | About Us | Services & Programs | Board Information | Staff | Newsletter |
Publications | Tree & Shrub Order Form | Links |
Contact Us | Privacy Policy & Disclaimer

©2002 Dakota County Soil and Water Conservation District
All rights reserved.

CHOOSE A SERVICE
OR PROGRAM

Waterways
Agricultural Erosion Control
Community Cost Share
Community Cost Share
Feedlots
Feedlots
GIS
Geographic Information Systems
Native Prairie
Native Plantings
Shoreline Stabilization
Shoreline Stabilization
Urban Erosion Control
Urban Erosion Control
Watershed Management
Watershed Management
Wetlands
Wetlands