Home | Contact Us | Calendar | News   


Watershed Management: Mississippi Makeover Project


Mississippi Makeover
Implementation Plan
Fact Sheet

Mississippi Makeover
Implementation Plan
June 2011

The ultimate goal of the Mississippi Makeover Project is a healthy and protected ecosystem that attracts abundant wildlife, becomes a mecca for outdoor enthusiasts, and provides economic benefits to local communities in the areas of Spring Lake, the Lower Vermillion River and Pool 3 of the Mississippi River. To accomplish this, the Project engaged local citizens in visioning and planning for ecosystem restoration in this area. A Citizen Advisory Group (CAG) was formed that includes elected officials, citizens, non-governmental organizations, agencies, industry, and commerce. Over the course of several meetings and with input from technical experts, the CAG recommended a series of targets or goals for ecological restoration in this area using indicators such as water clarity, aquatic vegetation, sedimentation, invertebrates, fish and waterfowl. Please see the link to "Indicator Targets".


Mississippi Makeover
2013 Report Card

Indicator Targets

Mississippi Makeover
Project Fact Sheet

In 2011, the CAG helped complete the Implementation Plan for this area which included a prioritization of large restoration activities like island building, water level management, shoreland habitat management and more. The Implementation Plan Fact Sheet provides a summary of needed restoration projects and the CAG priorities.

Today the Mississippi Makeover Project continues to engage citizens and elected officials, track progress towards the restoration goals, and coordinate with other groups and organizations to implement restoration.

This Project is funded by the Minnesota Pollution Control Agency and is coordinated by the Dakota County Soil and Water Conservation.

Indicator Fact Sheets:

Fish
Invertebrates

Sedimentation
Vegetation

Water Clarity


Citizen Advisory Group

 06/18/2013   Boat Tour of Pool 3, North Lake and Sturgeon Lake    
Materials: Final Itinerary and Restoration Fact Sheets
Notes on Restoration Projects from ACOE
Pool 3 Restoration Potential Fact Sheet

 12/17/2012   Mississippi Makeover State of the River Report Presentation   Event Invitation 
Link: State of the River

 05/26/2011   Agenda 

 03/31/2011   Agenda 
Presentations: CAG MMO Plan Presenation

 6/1/2010   Water bird Survey Press Release | Water bird Survey Fact Sheet

 01/28/2010   Open House Flyer | Press Release   
Presentations: Flint Hills Resources Open House
Press: South Washington County Bulletin
Red Wing Republican Eagle
Hastings Star Gazette 1
Hastings Star Gazette 2





 12/01/2009   Agenda | Minutes   
Presentations: Spring Lake Clean Up
New Carter Slough
Bullfrog Pond Project
Island Planning Details
Drawdown Potential in Mississippi





 08/18/2009   Agenda | Minutes   
Presentations: Final Indicators
ACOE Projects
MDNR Projects
WDNR Projects




 04/22/2009   Agenda | Minutes   
Presentations: Indicator Metrics
Update and Historical Accounts





 02/17/2009   Background Information
Presentations: Bullfrog Pond History
Spring Lake History
Vermillion River Sloughs



 12/09/2008   Agenda | Minutes
Presentations: Overview
Lake Pepin
Water Quality




Mississippi Makeover Map

Links:

Friends of Pool 2

Clean Water Legacy Program (Minnesota Department of Natural Resources)

Lake Pepin Legacy Alliance

Lake Pepin Watershed Total Maximum Daily Load Eutrophication and Turbidity Impairments (Minnesota Pollution Control Agency)

Navigation and Ecosystem Sustainability Program (US Army Corps of Engineers)